Minimizing work overload in mixed-model assembly lines

delete2008-03-01
delete42
PRE
AI
J
Joaquín Bautista Valhondo *
J
Jaime Alemañ Cano
DOI:10.1016/j.ijpe.2006.08.019delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
A variant of the mixed-model sequencing problem on assembly lines is the one proposed by Yano and Rachamadugu in 1991. They consider time windows in workstations and the work overload concept-sum of differences between real completion time in the workstation and due dates, which depends on the time window value. This paper proposes some procedures for solving the problem, and compares them with others taken from literature using two computational experiments. (c) 2007 Elsevier B.V. All rights reserved.
Keywords:
scheduling
sequencing
just-in-time
work overload
heuristics
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Economics cover
International Journal of Production Economics
IF:
10
Papers:
7.9K
Citations:
3.6W

Organization

U
universitat politecnica de catalunya
Scholars:
1.9W
Papers: 1.6W
Citations: 17