arrow
Return

Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing

delete1996-11-01
delete57
PRE
AI
H
Hartmut Stadtler *
DOI:10.1016/0377-2217(95)00094-1delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Recently there have been two new proposals to model the dynamic multi-item multi-level capacitated lotsizing problem by variable redefinitions based on either a shortest route or a simple plant location representation of the underlying decision problem. Here we will introduce an extended version of the well-known inventory and lotsize model followed by a new model formulation based on modeling the changes of end-of-period inventory levels explicitly. Secondly, we will compare the suitability of different model formulations when solving problem instances with up to 40 items and 16 periods utilizing state-of-the-art standard MTP software on a personal computer.
Keywords:
production planning
lotsize
mathematical programming
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

No organization information available