arrow
Return

Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects

delete2015-11-01
delete36
PRE
AI
W
Wail Menesi
T
Tarek Hegazy *
DOI:10.1061/(ASCE)ME.1943-5479.0000338delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper aims at providing a fast near-optimum solution to the multimode resource-constrained project scheduling problem (MRCPSP) in large-scale projects, with and without resource-leveling constraints. The MRCPSP problem is known to be nondeterministic polynomial-time hard (NP-hard) and has been solved using various exact, heuristic, and metaheuristic procedures. In this paper, constraint programming (CP) is used as an advanced mathematical optimization technique that suits scheduling problems. The IBM ILOG modeling software and its CPLEX-CP solver engine have been used to develop a CP optimization model for the MRCPSP problem. Unlike many metaheuristic methods in literature, the CP model is fast and provides a near-optimum solution to the MRCPSP for projects with hundreds of activities within minutes. The paper compares the CP results with two case studies from the literature to prove the practicality and usefulness of the CP approach to both researchers and practitioners. One case study was used as the basis for creating larger projects with up to 2,000 activities. The results reported in this paper can be used as a benchmark for other researchers to compare and improve. This research contributes to developing a practical decision support system for resolving real-life constraints in projects. (C) 2014 American Society of Civil Engineers.
Keywords:
Construction management
Scheduling
Constraint programming
Multimode resource-constrained scheduling
Constrained resource scheduling
Schedule optimization
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of Management in Engineering
IF:
7
Papers:
3.1K
Citations:
6.8K

Organization

U
University of Waterloo
Scholars:
2.2W
Papers: 2.3W
Citations: 3.3W