arrow
Return

No-wait flow shop scheduling using fuzzy multi-objective linear programming

delete2008-08-01
delete24
PRE
AI
B
Babak Javadi *
M
Mohammad Saidi‐Mehrabad
A
Alireza Haji
I
Iraj Mahdavi
F
Fariborz Jolai
N
Nezam Mahdavi‐Amiri
DOI:10.1016/j.jfranklin.2007.12.003delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker's overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.
Keywords:
no-wait flow shop scheduling
multi-objective linear programming
fuzzy multi-objective linear programming
decision maker
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of the Franklin Institute-Engineering and Applied Mathematics
IF:
3.7
Papers:
6.3K
Citations:
1.5W

Organization

U
University of Tehran
Scholars:
2.4W
Papers: 2.3W
Citations: 2.7W
S
Sharif University of Technology
Scholars:
1.1W
Papers: 1.1W
Citations: 9.5K