Return
No-wait flow shop scheduling using fuzzy multi-objective linear programming
DOI:10.1016/j.jfranklin.2007.12.003.png)
Abstract
En 中文
This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker's overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.
Keywords:
no-wait flow shop scheduling
multi-objective linear programming
fuzzy multi-objective linear programming
decision maker
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
J
IF:
3.7
Papers:
6.3K
Citations:
1.5W

