Optimal BIM staffing in construction projects using a queueing model
DOI:10.1016/j.autcon.2020.103123.png)
Abstract
En 中文
BIM staff plays the important role of providing required information from digital models to project participants. A dilemma is determining the appropriate capacity of BIM staff without sacrificing efficiency in terms of human resource costs. Despite the importance of BIM staffing, its effects on the productivity and performance of construction projects have rarely been investigated. This study presents a framework for quantifying the impact of BIM staffing. First, this study proposes a method to evaluate the activities of BIM staff by introducing a time-dependent queueing model. Second, the proposed framework is validated with data from three real-world projects in which BIM was applied. The effects of BIM staffing on the waiting time of project participants are quantitatively analyzed using time and cost indicators. The results show that decisions about optimal BIM staffing can be made by considering the waiting costs of project participants.
Keywords:
BIM staffing
Queueing model
BIM RFIs
Waiting time
Waiting cost
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
11.5
Papers:
6.2K
Citations:
4.2W