Abstract

Abstract

En 中文
Wind farm cable length has a direct impact on the project cost, reliability, and electrical losses. The optimum cable layout results in a lower unit cost of generating electricity offshore. This paper explores three cabling structures: the string structure, ring structure, and multiloop structure on a three-dimensional seabed The newly proposed multiloop structure increases reliability and proves to be most economic when the failure rate and mean time to repair of cables are relatively high. Particle swarm optimization is used to find the optimal substation location that minimizes the overall cable distance.
Keywords:
String structure
ring structure
multi-loop structure
3D seabed
particle swarm optimization
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Transactions on Energy Conversion cover
IEEE Transactions on Energy Conversion
IF:
5.4
Papers:
6.8K
Citations:
1.5W

Organization

U
university of london
Scholars:
21.5W
Papers: 19.7W
Citations: 305
I
Imperial College London
Scholars:
8.3W
Papers: 7.3W
Citations: 11.1W