arrow
Return

Optimization models for the tool change scheduling problem

delete2008-10-01
delete32
PRE
AI
C
Chen, Jen-Shiang *
DOI:10.1016/j.omega.2006.04.006delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals with a single machine scheduling problem subject to tool wear, given the allowed maximum continuous working time of the machine is T-L (tool life) and the tool change time is T-C. Job processing and tool changes are scheduled simultaneously. In this paper, we examine this problem to minimize the total tardiness of jobs. Two mixed binary integer programming models are developed to optimally solve this problem. Computational experiments are performed to evaluate the models' efficiency. (C) 2006 Elsevier Ltd. All rights reserved.
Keywords:
scheduling
tool change
integer programming
tardiness
availability constraints
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

O
Omega-International Journal of Management Science
IF:
7.2
Papers:
3.7K
Citations:
1.4W

Organization

No organization information available
Cited Papers

Cited Papers

errShare
errSave