Return
Optimization models for the tool change scheduling problem
DOI:10.1016/j.omega.2006.04.006.png)
Abstract
En 中文
Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals with a single machine scheduling problem subject to tool wear, given the allowed maximum continuous working time of the machine is T-L (tool life) and the tool change time is T-C. Job processing and tool changes are scheduled simultaneously. In this paper, we examine this problem to minimize the total tardiness of jobs. Two mixed binary integer programming models are developed to optimally solve this problem. Computational experiments are performed to evaluate the models' efficiency. (C) 2006 Elsevier Ltd. All rights reserved.
Keywords:
scheduling
tool change
integer programming
tardiness
availability constraints
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
O
IF:
7.2
Papers:
3.7K
Citations:
1.4W
Organization
No organization information available

