Return
Optimization of production process for resource utilization
DOI:10.1016/j.acme.2019.07.002.png)
Abstract
En 中文
The paper presents a method of scheduling execution of technological operations in work centres in a company manufacturing seats for passenger cars. To that end, an optimization algorithm based on the B&B method was developed, aimed at minimizing the number of employees necessary for operation of the work centres and at maximizing capacity of the manufacturing process. Efficiency and effectiveness of the algorithm was verified on the grounds of real data coming from the manufacturing company. (C) 2019 Politechnika Wroclawska. Published by Elsevier B.V. All rights reserved.
Keywords:
Optimization
Production cell
No-store constraint
Cyclic scheduling
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
4.4
Papers:
2.4K
Citations:
6.2K

