Return
Optimizing continuous-time berth allocation, time-variant quay crane and yard assignment
DOI:10.1016/j.trb.2025.103317.png)
Abstract
En 中文
• We formulate a continuous-time berth allocation and yard space assignment model. • The model considers time-variant QC scheduling. • We develop an exact algorithm with some acceleration tactics. • Sensitivity analyses are conducted to derive potentially useful managerial insights.
Journal
IF:
6.3
Papers:
3.5K
Citations:
1.9W

