Parallel machine scheduling with maintenance activities

delete2016-11-01
delete43
PRE
AI
J
Jaewook Yoo
I
Ik Sun Lee *
DOI:10.1016/j.cie.2016.09.020delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper considers a problem of scheduling on parallel machines where each machine requires maintenance activity once over a given time window. The objective is to find a coordinated schedule for jobs and maintenance activities to minimize the scheduling cost represented by either one of several objective measures including makespan, (weighted) sum of completion times, maximum lateness and sum of lateness. The problem is proved to be NP-hard in the strong sense in each case of the objective measures. Some restricted cases of the problem are also characterized for their complexities, for which the associated dynamic programming algorithms are derived. (C) 2016 Elsevier Ltd. All rights reserved.
Keywords:
Scheduling
Maintenance
Parallel machine
Problem complexity
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Computers and Industrial Engineering cover
Computers and Industrial Engineering
IF:
6.5
Papers:
1.0W
Citations:
3.8W

Organization

D
Dong A University
Scholars:
3.7K
Papers: 3.6K
Citations: 111
Cited Papers

Cited Papers

Genetic inactivation of D-amino acid oxidase enhances extinction and reversal learning in mice
err2008-12-30
err0
errOAAI
errViviane Labrie; Steven Duffy; Wei Wang; Steven W. Barger; Glen B. Baker; John C. Roder
errShare
errSave
Prevalence of single and multiple HPV types in cervical carcinomas in Jakarta, Indonesia
err2004-04-01
err0
PREAI
errMaaike C Schellekens; Anneke Dijkman; Mohammad Farid Aziz; Budiningsih Siregar; Santoso Cornain; Sandra Kolkman-Uljee; Lex A.W Peters; Gert Jan Fleuren
errShare
errSave
Lateral Cortical Impact Injury in Rats: Pathologic Effects of Varying Cortical Compression and Impact Velocity
err1994-10-01
err0
PREAI
errJ. CLAY GOODMAN; LEELA CHERIAN; ROBERT M. BRYAN; CLAUDIA S. ROBERTSON
errShare
errSave
researcher View more