Parallel Workforce Assignment Problem for Battery Production

delete2021-11-11
delete1
PRE
AI
A
Aslıhan Erdoğan
A
Ayşenur Talı
B
Berfu Kırcalı
B
Buket Günal
E
Ecem Nazlı Dedecengiz
Y
Yuksel, Damla *
E
Ekren, Banu Yetkin
DOI:10.1007/978-3-030-90421-0_64delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper studies workforce assignment problem for battery production in a company in Turkey. Several types of batteries are produced in the studied company. Mostly, the operations are semi-automated. In the production process, the workers are assigned to multiple operations irregularly based on the priority of productions. In the company, average utilization of worker is low, and average cycle time of a product is high due to inefficient allocation of the workforce within the operations. In order to analyze the main system problem, we simulate the system and observe the queue lengths to identify the bottlenecks. By dynamic assignment of workers at stations based on real time queue conditions, the workloads can be balanced throughout the production lines. In this project, a simulation-based system improvement is completed by applying: (i) dynamic utilization of workforce to reduce average cycle time of a battery, (ii) assignment of parallel workforce where they can work for the same operation simultaneously, and (iii) observation of real-time queue lengths of stations. Three dynamic assignment policies are developed and compared with each other. The best policy providing minimum cycle time for a battery production is selected to be the best.
Keywords:
Optimization
Assembly line balancing
Workforce allocation problem
Simulation modelling
Workforce change

Journal

D
Digitizing Production Systems
IF:
0
Papers:
3
Citations:
0

Organization

Y
Yasar University
Scholars:
386
Papers: 572
Citations: 2
Cited Papers

Cited Papers

Clinical evaluation of the Oculus Keratograph
err2012-08-01
err0
PREAI
errN. Best; L. Drury; J.S. Wolffsohn
errShare
errSave
A classification of assembly line balancing problems
err2007-12-01
err675
PREAI
errBoysen, Nils; Fliedner, Malte; Scholl, Armin
errShare
errSave
no more