Partitioning approach based on convex hull and multiple choice for solving hydro unit-commitment problems
DOI:10.1016/j.epsr.2022.108285.png)
Abstract
En 中文
The hydro unit-commitment (HUC) problem aims to determine the status of generating units (GUs) and their generation levels, usually in a day-head planning horizon. The HUC is a complex mixed-integer nonlinear pro-gramming (MINLP) problem whose great challenge is accurately representing each hydro production function (HPF) with high computational efficiency. This work proposes to solve the HUC problem using an algorithm based on mixed-integer linear programming (MILP) that updates the gross head iteratively and splits the uni-variate HPF into concave and convex regions. Piecewise linear approximations are created via the convex hull for concave regions, allowing gathering identical UGs to alleviate the computational burden. On the other hand, the multiple choice model approximates the HPF convex regions. The simulations, carried out in two cascade sys-tems, one with five plants and 18 GUs and the other with four plants and 53 GUs, show that the proposed approach can solve the problem quickly and accurately.
Keywords:
Hydro unit commitment
Partitioning of the hydro production function
Convex hull
Multiple choice
Journal
IF:
4.2
Papers:
1.1W
Citations:
2.2W