Predicting construction schedule performance with last planner system and machine learning

delete2024-11-01
delete0
PRE
AI
C
Camilo I. Lagos
R
Rodrigo F. Herrera *
C
Cawley, Alejandro F. Mac
L
Luís F. Alarcón
DOI:10.1016/j.autcon.2024.105716delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Construction project schedules deviate due to uncertainty and variability unless timely actions are implemented. While the limitations of traditional management practices help to facilitate such assessments have been widely covered, quantitative LPS research has shown empirical relations between its indicators, performance, and outcome. This paper creates a model to predict the schedule outcome during early execution using the LPS metrics and the Design Science approach. 18 solution artifacts were evaluated to predict three schedule outcome variables using 15 indicators in 1464 sample points collected from nine subsequent execution intervals from 164 projects. The selected artifact predicted the schedule outcome, which is a combination of the schedule performance at planned completion and the actual schedule deviation at completion, with a MAE of 1.24% and R2 = 0.96 averaged across the nine execution intervals, using solely LPS indicators. The model can be applied as an early warning mechanism in LPS IT-Support software.
Keywords:
Schedule
Last planner system
Machine learning
Prediction
Design science research

Journal

Automation in Construction cover
Automation in Construction
IF:
11.5
Papers:
6.2K
Citations:
4.2W

Organization

P
Pontificia Universidad Catolica de Chile
Scholars:
1.5W
Papers: 1.2W
Citations: 16
P
pontificia universidad catolica de valparaiso
Scholars:
3.2K
Papers: 3.0K
Citations: 0