In this article, the problem of process scheduling under uncertainty was studied using multiparametric programming method. Based on the uncertainty type (prices, demands, and processing times), the scheduling formulation results in different parametric problems including multiparametric mixed integer linear (mpMILP), quadratic (mpMIQP), and general nonlinear programming (mpMINLP) problem. This article analyzes the solution characteristics and proposes a novel solution framework for specific mpMILP/mpMIQP problems addressing a wide variety of scheduling problems under different types of uncertainty, which are modeled as coefficient in objective function, as coefficient of integer variable and right hand side vector of the constraints. The main idea of the proposed framework is to decompose the problem into a series of smaller subproblems, each of them producing the parametric information around a given parameter value. The parametric solution of every subproblem is retrieved by solving a series of multiparametric linear programming (mpLP) and mixed integer linear/nonlinear programming problems (MILP/MINLP). Several examples were solved to analyze the complexity and the effectiveness of the proposed method. (c) 2007 American Institute of Chemical Engineers AIChE J, 53: 3183-3203, 2007.
Keywords:
process scheduling
uncertainty
multiparametric programming
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

AIChE Journal cover
AIChE Journal
IF:
4
Papers:
1.1W
Citations:
2.9W

Organization

No organization information available
Cited Papers

Cited Papers

Colonic pericryptal fibroblasts
err1989-01-01
err0
PREAI
errA. -P. Sappino; P. -Y. Dietrich; O. Skalli; S. Widgren; G. Gabbiani
errShare
errSave
Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
err2006-05-28
err111
PREAI
errJanak, Stacy L.; Floudas, Christodoulos A.; Kallrath, Josef; Vormbrock, Norbert
errShare
errSave
errShare
errSave
errShare
errSave
researcher View more