Production planning problem with sequence dependent setups as a bilevel programming problem

delete2008-06-01
delete39
PRE
AI
Z
Zrinka Lukač *
K
Kristina Šorić
V
Višnja Vojvodić Rosenzweig
DOI:10.1016/j.ejor.2006.09.029delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Each of it products is to be processed on two machines in order to satisfy known demands in each of T periods. Only one product can be processed on each machine at any given time. Each switch from one item to another requires sequence dependent setup time. The objective is to minimize the total setup time and the sum of the costs of production, storage and setup. We consider the problem as a bilevel mixed 0-1 integer programming problem. The objective of the leader is to assign the products to the machines in order to minimize the total sequence dependent setup time, while the objective of the follower is to minimize the production, storage and setup cost of the machine. We develop a heuristics based on tabu search for solving the problem. At the end, some computational results are presented. (c) 2006 Elsevier B.V. All rights reserved.
Keywords:
production
two machines
sequence dependent setup times
bilevel mixed 0-1 integer programming problem
heuristics based on tabu search
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

U
University of Zagreb
Scholars:
1.8W
Papers: 1.3W
Citations: 1.1W
Cited Papers

Cited Papers

Adsorptive removal of bisphenol A (BPA) from aqueous solution: A review
err2017-02-01
err0
PREAI
errAmit Bhatnagar; Ioannis Anastopoulos
errShare
errSave
errShare
errSave
researcher View more