Abstract

Abstract

En 中文
• Progressive hedging algorithm to schedule stochastically arriving projects proactively. • Flexible project structure and resource inventory determination to model projects in modular production. • Proactively scheduling projects without future schedule modifications.
Keywords:
Resource constrained project scheduling problem
Flexible project structure
Stochastic optimization
Modular production
Progressive hedging
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

D
Delft University of Technology
Scholars:
2.6W
Papers: 2.5W
Citations: 3.8W
Cited Papers

Cited Papers

A hybrid genetic algorithm for the resource-constrained project scheduling problem
err2008-03-01
err200
PREAI
errValls, Vicente; Ballestin, Francisco; Quintanilla, Sacramento
errShare
errSave
errShare
errSave
errShare
errSave
researcher View more