arrow
Return

Resource leveling with subcontracting: algorithms and complexity

delete2025-12-01
delete0
delete
OA
AI
N
Nicholas G. Hall *
M
Marc E. Posner
DOI:10.1007/s10951-025-00861-0delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
A central problem in project management is the optimal use of limited resources. We consider the resource leveling problem, which minimizes the maximum resource load over the life of a project. This problem is motivated by the need to limit expensive resource acquisition. For several variants of this problem, we either provide an efficient optimal algorithm or show that the problem is intractable. We also consider a generalization of the resource leveling problem where work can be subcontracted. The subcontracting cost is defined either by task or by time of subcontracting. Our results show how the solvability of resource leveling problems depends on whether task times are unit or arbitrary, whether resource requirements are unit or binary, whether the project network is a chain, a tree, or an opposing forest, whether subcontracting costs for jobs are unit or binary, and whether the availability of subcontracting at a time period is constrained.
Keywords:
Project management
Minimizing maximum resource usage
Outsourcing
Algorithms
Production/scheduling
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of Scheduling
IF:
1.8
Papers:
20
Citations:
1.4K

Organization

U
University System of Ohio
Scholars:
15.4W
Papers: 13.0W
Citations: 200
O
Ohio State University
Scholars:
4.1W
Papers: 3.2W
Citations: 80