Return
Scheduling DAG-structured workloads based on whale optimization algorithm
DOI:10.1007/s11227-025-07415-3.png)
Abstract
En 中文
Many computing workloads in big data and machine learning applications are structured as directed acyclic graphs (DAG) and deployed on PC clusters for parallel execution using multiple physical or virtual machines. The scheduling of such workloads is critical to the application performance such as execution time and a plethora of techniques have been developed, taking into account various aspects such as data locality, network bandwidth, and server capability. We formulate DAG-structured workload scheduling as a nonlinear integer programming (NIP) problem and prove it to be NP-complete. Our empirical study reveals a positive correlation between scheduling plan distance (SPD) and finish time gap (FTG), and based on this finding, we propose a running time gap strategy (RTGS) to tackle this scheduling problem in multiprocessor environments. RTGS follows the main optimization strategy in the family of whale optimization algorithm (WOA). We derive a new function and use a greedy algorithm to generate an effective scheduling plan in RTGS. Extensive experiments with real production traces from Alibaba on simulation environments and realistic Hadoop environments show that our approach significantly improves the stability of WOA when applied to the scheduling problem of DAG-structured workloads, and also reduces the workload completion time by up to 93% in comparison with seven state-of-the-art baseline algorithms.
Keywords:
Workload scheduling
Directed acyclic graph
Parallel computing
Whale optimization algorithm
Journal
IF:
2.7
Papers:
1.2K
Citations:
1.1W
Organization
Cited Papers
Integrative Approaches to the Study of Baleen Whale Diving Behavior, Feeding Performance, and Foraging Ecology
BioScience
IF0
DeepWeave: Accelerating Job Completion Time with Deep Reinforcement Learning-based Coflow Scheduling

