arrow
Return

Scheduling staff using mixed integer programming

delete1997-05-01
delete84
delete
OA
AI
B
Beaumont, N *
DOI:10.1016/S0377-2217(97)00055-6delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
This paper describes the solution of a problem of scheduling a workforce so as to meet demand which varies markedly with the time of day and moderately with the day of week. The main objectives are determining how many staff to employ and the times at which shifts should start. The problem is expressed as a large MIP problem initially presenting computational difficulties. The difficulties vanish when the formulation is modified and a package allowing the use of reduce and (especially) special ordered sets becomes available. The client has commissioned the study primarily to benchmark its existing schedule by comparing it with a theoretical optimum. The optimal schedule and comparison are very sensitive to technical and cost coefficients which are not precisely known.
Keywords:
scheduling
staff rostering
integer programming
A mixed integer linear programming model for multi-satellite scheduling
err2019-06-01
err99
errOAAI
errChen, Xiaoyu; Reinelt, Gerhard; Dai, Guangming; Spitz, Andreas
errShare
errSave
errShare
errSave

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
8.1W

Organization

No organization information available
Cited Papers

Cited Papers

A HEURISTIC-PROCEDURE FOR THE CREW ROSTERING PROBLEM
err1992-04-01
err44
PREAI
errBIANCO, L; BIELLI, M; MINGOZZI, A; RICCIARDELLI, S; SPADONI, M
errShare
errSave
err
IF0
err
err0
PREAI
err
errShare
errSave
Cardiopulmonary Bypass, Hypothermic Circulatory Arrest and Barbiturate Cerebral Protection for the Treatment of Giant Vertebrobasilar Aneurysms in Children
err1994-01-01
err0
PREAI
errKarl A. Greene; Frederick F Marciano; Mark G. Hamilton; James M. Herman; Harold L. Rekate; Robert F. Spetzler
errShare
errSave
errShare
errSave
errShare
errSave
no more