In this paper we address a scheduling problem with multi-attribute setup times originated from the manufacturing plant of a company producing PVC sheets. In the considered scheduling problem, each job has a number of attributes and each attribute has one or more levels. Because there is at least one different level of attribute between two adjacent jobs, it is necessary to make a setup adjustment whenever there is a switch to a different job. The objective of the problem is to determine a processing sequence so as to minimize the total setup time on a single machine. We develop a constructive heuristic based on several theorems for the problem. The heuristic has been evaluated by comparing with an existing constructive heuristic, a tabu search heuristic and a dynamic programming approach, and its efficiency and effectiveness have been demonstrated. The computational results show that the proposed heuristic outperforms the current scheduling method used by the case plant with a significant improvement. (C) 2012 Elsevier Ltd. All rights reserved.
Keywords:
Scheduling
Single machine
Multi-attribute setup times
Heuristic

Journal

Computers and Industrial Engineering cover
Computers and Industrial Engineering
IF:
6.5
Papers:
1.0W
Citations:
3.8W

Organization

N
national taiwan university of science & technology
Scholars:
8.8K
Papers: 8.7K
Citations: 9