Sequential space conversion method with multi-armed bandit algorithm for time-variant reliability and dynamic project management

delete2025-08-07
delete0
PRE
AI
M
Mahmoud Miri *
M
Mohsen Rashki
DOI:10.1016/j.ress.2025.111540delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
• Project management is formulated as a special case of time-variant reliability. • Multi-Armed Bandit adaptively tunes SESC scale ratio for improved efficiency. • Time-cost correlation modeling enhances accuracy in project risk analysis. • SESC-MAB balances accuracy and computational cost in time-variant reliability. • Time-cost correlation reveals up to 90% discrepancy versus time-only models.
Keywords:
project management
time-variant reliability
multi-armed bandit
time-cost correlation
computational efficiency

Journal

R
Reliability Engineering and System Safety
IF:
11
Papers:
9.0K
Citations:
4.2W

Organization

U
University of Sistan and Baluchestan
Scholars:
116
Papers: 80
Citations: 1.0K