Return
Single-machine scheduling problems with a batch-dependent aging effect and variable maintenance activities
DOI:10.1080/00207543.2017.1398424.png)
Abstract
En 中文
We consider single-machine scheduling problems with a batch-dependent ageing effect and variable maintenance activities between batches. The machine can process several jobs as a batch. It requires maintenance activities where the maintenance time depends on the flow time of the pre-batch, i.e. the batch processed before a batch. A job's actual processing time is an increasing exponential function of its operation time within a batch. The objectives are to minimise the makespan and the total completion time. We develop polynomial time algorithms for the makespan minimisation problem and the total completion time minimisation problem under the condition that the ageing factor is greater than one. We also provide a mathematical programming approach and two heuristic algorithms to analyse the total completion time minimisation problem when the ageing factor is less than one for even one batch. The computational analysis indicates that the proposed heuristic algorithms are more efficient for the smaller ageing factor, whereas the Modified Shortest Processing Time algorithm is more efficient than the proposed heuristic algorithms for the larger ageing factor.
Keywords:
scheduling
single-machine
batch-dependent
ageing effect
maintenance activity
heuristic
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
7.3
Papers:
1.1W
Citations:
3.7W
Organization
Cited Papers
Single machine total completion time scheduling problem with workload-dependent maintenance duration