arrow
Return

Single-machine scheduling with a common due window

delete2001-02-01
delete54
PRE
AI
W
Wing‐Kwan Yeung
C
Ceyda Oǧuz *
T
T.C.E. Cheng
DOI:10.1016/S0305-0548(99)00097-0delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
We study several single-machine non-preemptive scheduling problems to minimize the sum of weighted earliness-tardiness, weighted number of early and tardy jobs, common due window location, and flowtime penalties. We allow the due window location to be either a decision variable or a given parameter. We assume that the due window location has a tolerance and the window size is a given parameter. We further make the assumption that the ratios of the job processing times to the earliness-tardiness weights are agreeable for the first problem. We propose pseudo-polynomial dynamic programming algorithms to optimally solve the problems. We also provide polynomial time algorithms for several special cases.
Keywords:
single-machine scheduling
earliness-tardiness
early-tardy jobs
flowtime
due window
dynamic programming
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

C
Computers and Operations Research
IF:
4.3
Papers:
6.5K
Citations:
1.8W

Organization

No organization information available