Single machine scheduling with a variable common due date and resource-dependent processing times

delete2003-07-01
delete64
PRE
AI
C
C.T. Ng
T
T.C.E. Cheng
M
Mikhail Y. Kovalyov
S
S.S. Lam
DOI:10.1016/S0305-0548(02)00066-7delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The problem of scheduling n jobs with a variable common due date on a single machine is studied. It is assumed that the job processing times are non-increasing linear functions of an equal amount of a resource allocated to the jobs. The due date and resource values can be continuous or discrete. The objective is to minimize a linear combination of scheduling, due date assignment and resource consumption costs. The resource consumption cost function may be non-monotonous. Algorithms with O(n(2) log n) running times are presented for scheduling costs involving earliness/tardiness and number of tardy jobs. Computational experiments show that the algorithms can solve problems with n = 5, 000 in less than a minute on a standard PC.
Keywords:
single machine scheduling
common due date assignment
controllable processing times
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

C
Computers and Operations Research
IF:
4.3
Papers:
6.5K
Citations:
1.8W

Organization

No organization information available