Single-machine scheduling with an external resource

delete2021-09-01
delete7
delete
OA
AI
D
Dirk Briskorn
M
Morteza Davari *
J
Jannik Matuschke
DOI:10.1016/j.ejor.2020.12.045delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
This paper studies the complexity of single-machine scheduling with an external resource, which is rented for a non-interrupted period. Jobs that need this external resource are executed only when the external resource is available. There is a cost associated with the scheduling of jobs and a cost associated with the duration of the renting period of the external resource. We look at four classes of problems with an external resource: a class of problems where the renting period is budgeted and the scheduling cost needs to be minimized, a class of problems where the scheduling cost is budgeted and the renting period needs to be minimized, a class of two-objective problems where both, the renting period and the scheduling cost, are to be minimized, and a class of problems where a linear combination of the scheduling cost and the renting period is minimized. We provide a thorough complexity analysis (NP-hardness proofs and (pseudo-)polynomial algorithms) for different members of these four classes. (C) 2020 Elsevier B.V. All rights reserved.
Keywords:
Scheduling
Single-machine scheduling
External resource
Complexity
Pseudo-polynomial algorithm
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

U
University of Wuppertal
Scholars:
3.3K
Papers: 2.8K
Citations: 4.7K
SKEMA Business School cover
SKEMA Business School
Scholars:
369
Papers: 440
Citations: 895