Solving fuzzy scheduling using clustering method and bacterial foraging algorithm

delete2023-02-28
delete2
PRE
AI
Y
Yingli Li
J
Jiahai Wang *
J
Jianxiang Gao
Z
Zhengwei Liu
DOI:10.1007/s00500-023-07931-5delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Multi-objective fuzzy flexible job-shop scheduling problem (MFFJSSP) is a combination of multi-objective fuzzy scheduling and flexible job shop scheduling, which has higher complexity and is an NP-hard problem. For incompletely automated job shop, MFFJSSP is more important and conforms to the actual production. To solve the MFFJSSP, an effective multi-objective fuzzy scheduling method was proposed. First, a fuzzy number processing method based on fuzzy clustering that is more in line with the actual production was designed to replace the classic triangular fuzzy number. Second, based on the critical path theory, a more efficient method of critical operation block selection and critical operation movement were designed and applied them to the chemotaxis stage of bacterial foraging optimization algorithm to improve the accuracy of optimization and reduce invalid movement. Third, a novel decision tree-based bacterial reproduction method was designed to prevent the algorithm from falling into a local optimal solution. Finally, some cases were generated to verify the feasibility and effectiveness of the proposed algorithm from multiple dimensions.
Keywords:
Flexible job shop
Multi-objective optimization
Bacterial foraging algorithm
Fuzzy scheduling

Journal

Soft Computing cover
Soft Computing
IF:
2.5
Papers:
1.0W
Citations:
2.1W

Organization

T
tongji university
Scholars:
7.9W
Papers: 6.0W
Citations: 98
Cited Papers

Cited Papers

Climate factors affecting conception rate of high producing dairy cows in northeastern Spain
err2007-05-01
err0
PREAI
errI. García-Ispierto; F. López-Gatius; G. Bech-Sabat; P. Santolaria; J.L. Yániz; C. Nogareda; F. De Rensis; M. López-Béjar
errShare
errSave
A genetic algorithm for the Flexible Job-shop Scheduling Problem
err2008-10-01
err759
PREAI
errPezzella, F.; Morganti, G.; Ciaschetti, G.
errShare
errSave
researcher View more