arrow
Return

Solving large scale crew scheduling problems

delete1997-03-01
delete46
PRE
AI
C
Chu, HD
G
Gelman, E
J
Johnson, EL
DOI:10.1016/S0377-2217(96)00196-8delete
deleteOriginal
deleteShare
deleteSave
Abstract

Abstract

En 中文
The crew pairing problem is posed as a set partitioning zero-one integer program. Variables are generated as legal pairings meeting all work rules. Dual values obtained from solving successive large linear program relaxations are used to prune the search tree. In this paper we present a graph based branching heuristic applied to a restricted set partitioning problem representing a collection of 'best' pairings. The algorithm exploits the natural integer properties of the crew pairing problem. Computational results are presented to show realized crew cost savings.
Solving a large-scale integrated fleet assignment and crew pairing problem
err2016-09-22
err15
PREAI
errOzener, Okan Orsan; Matoglu, Melda Ormeci; Erdogan, Gunes; Haouari, Mohamed; Sozer, Hasan
errShare
errSave
The Crew Timetabling Problem: An extension of the Crew Scheduling Problem
err2006-06-01
err5
PREAI
errCastilho Gomes, Marta; Cavique, Luis; Themido, Isabel
errShare
errSave
Airline crew scheduling: State-of-the-art
err2005-11-01
err132
PREAI
errGopalakrishnan, B; Johnson, EL
errShare
errSave
errShare
errSave

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
8.1W

Organization

No organization information available
Cited Papers

Cited Papers

Preliminary Results on Different Impedance Contrast Agents for Pulmonary Perfusion Imaging with Electrical Impedance Tomography
err2013-04-18
err0
errOAAI
errD T Nguyen; R Kosobrodov; M A Barry; W Chik; J Pouliopoulos; T I Oh; A Thiagalingam; A McEwan
errShare
errSave