Return
Solving resource-constrained project scheduling problems: Conceptual validation of FLP formulation and efficient permutation-based ABC computation
DOI:10.1016/j.cor.2013.02.012.png)
Abstract
En 中文
In this paper, we propose two alternative approaches, applying the facility layout problem (FLP) concept and integrating the permutation-based artificial bee colony (PABC) algorithm, to effectively tackle the resource-constrained project scheduling problem (RCPSP). In the FLP formulation, the constraints are expressed to design the activities in the space constructed by resource and temporal restrictions, without violating the precedence relationships and overlaps between the activities. For dodging the difficulty of the FLP-based model to treat large-sized instances of NP-hard RCPSP, the permutation representation scheme of the PABC algorithm is in turn introduced utilizing the artificial bee colony (ABC) process to search the best solution for RCPSP. In the procedure, a crossover operator and an insert operator following the update equation of the ABC algorithm are devised to augment the effectiveness of computation, whereas a shift operator subject to the resource utilization ratio value is suggested to diversify the solutions. The makespan is then obtained and improved with the assistance of a serial scheduling scheme and a double justification skill. Subsequently, the computational experiments conducted substantiate the conceptual validity of the proposed facility layout formulation for RCPSP and the comprehensive simulation shows the effectiveness of the PABC algorithm for RCPSP. (C) 2013 Elsevier Ltd. All rights reserved.
Keywords:
Resource-constrained project
scheduling problem
Facility layout problem
Artificial bee colony optimization
Permutation representation scheme
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
C
IF:
4.3
Papers:
6.5K
Citations:
1.8W