Abstract

Abstract

En 中文
The aim of this note is to show by a counter-example that some results in recent papers (Mosheiov and Oron, 2010; Mor and Mosheiov, 2012) are merely calculation mistakes. Correct results of these two papers are also provided. (C) 2015 Elsevier B.V. All rights reserved.
Keywords:
Scheduling
Due-window assignment
Maintenance activity
Common flow allowance
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Economics cover
International Journal of Production Economics
IF:
10
Papers:
8.1K
Citations:
3.6W

Organization

S
Shenyang Aerospace University
Scholars:
3.1K
Papers: 1.9K
Citations: 2.0K
Cited Papers

Cited Papers

errShare
errSave
A survey on scheduling problems with due windows
err2015-04-01
err105
PREAI
errJaniak, Adam; Janiak, Wladyslaw A.; Krysiak, Tomasz; Kwiatkowski, Tomasz
errShare
errSave
Two-machine flowshop scheduling with a truncated learning function to minimize the makespan
err2013-01-01
err67
PREAI
errCheng, T. C. E.; Wu, Chin-Chia; Chen, Juei-Chao; Wu, Wen-Hsiang; Cheng, Shuenn-Ren
errShare
errSave
Scheduling production for a sawmill: A robust optimization approach
err2014-04-01
err42
PREAI
errVaras, Mauricio; Maturana, Sergio; Pascual, Rodrigo; Vargas, Ignacio; Vera, Jorge
errShare
errSave
researcher View more