arrow
Return

Study on Stochastic SCUC Based BESS Planning Problem

delete2017-04-01
delete1
PRE
AI
F
Fanxing Meng *
孙英云 (Yingyun Sun)
DOI:10.1109/ICEI.2017.26delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The application of Battery-based Energy Storage System (BESS) has many benefits in the power grid such as frequency support, emergency assistance, lowering costs, and flattening the load curve. In this paper, a modified stochastic security-constrained unit commitment (SCUC) model is introduced to simulate the daily operation of power system. By setting both installed position and capacity of BESS as optimization variables, the model can give the optimal location and capacity of BESS simultaneously. Scenario trees are adopted to represent the forecasting inaccuracies of wind power and load. Furthermore, a benders decomposition based algorithm is used to solve the model. Two classical cases, IEEE 6-bus and IEEE 118-bus system, are used to verify the effectiveness of the proposed approach.
Keywords:
Battery-based Energy Storage System (BESS)
Capacity Configuration
Location Configuration
Stochastic SCUC
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

I
IEEE International Conference on Energy Internet
IF:
0
Papers:
9
Citations:
0

Organization

N
north china electric power university
Scholars:
2.5W
Papers: 1.7W
Citations: 16