Return
The ARBRE project: Progress achieved
P
H
L
DOI:10.1016/S0961-9534(98)00018-X.png)
Abstract
En 中文
This paper will discuss the progress achieved in the ARBRE project, a joint venture that includes Yorkshire Water Projects of the United Kingdom and Termiska Processer AB of Sweden. The project will be fuelled by a mix of wood from forestry residues and from short rotation coppices, some of which will be organically fertilised with digested sewage sludges. A Biomass Integrated Gasification Combined Cycle (BIGCC) electricity generation plant will be constructed at Eggborough, North Yorkshire, which will provide gas to a gas turbine and steam turbine generation system, producing 10 MW and exporting 8 MW of electricity. It has been included in the 1993 tranche of the UKs Non Fossil Fuel Obligation (NFFO) and has gained financial support from the European Commission's THERMIE programme as a targeted BIGCC project. The following aspects will be described in the paper: technical design; award of planning permission, including environmental issues and benefits; fuel supplies; short rotation coppice establishment; project timescales. (C) 1998 Elsevier Science Ltd. All rights reserved.
Keywords:
ARBRE project
gas turbine
steam turbine
fuel supplies
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
5.8
Papers:
8.4K
Citations:
2.2W
Organization
No organization information available