The two-machine total completion time flow shop problem
DOI:10.1016/0377-2217(95)00351-7.png)
Abstract
En 中文
In this paper we study the NP-hard scheduling problem of minimizing total completion time in a two-machine now shop. Five known lower bounds are discussed and two new ones are presented. A new dominance criterion is also proposed. Several versions of a branch and bound method are derived by applying, both individually and combined, these lower bounds. A heuristic procedure is also presented that uses a constructive O(n(2)) time method, which computes a good starting solution, together with a neighborhood search based on pairwise interchanges. Computational results show that the exact method can handle problems of up to 30 jobs in size within a reasonable amount of time and that the heuristic procedure has an average error of less than 0.5% from the optimal value and less than 2.7% from the lower bound.
Keywords:
flow shop scheduling
branch and bound
neighborhood search
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
6
Papers:
2.2W
Citations:
6.4W
Organization
No organization information available
Cited Papers
The Diagnostic Validity of Melancholic Major Depression in a Population-Based Sample of Female Twins
Survival Experience Following Nd:YAG Laser Photoresection for Primary Bronchogenic Carcinoma
Chest
IF0
no more