arrow
Return

Two‐machine flowshop scheduling with conditional deteriorating second operations

delete2006-03-09
delete0
PRE
AI
DOI:10.1111/j.1475-3995.2006.00536.xdelete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
AbstractThis paper considers a flowshop‐scheduling problem with a waiting time constraint imposed to restrict the processing of the two operations of each job. If the second operation of a job cannot start within a specified waiting time after the completion of its first operation, then an extra processing time will be incurred for its second operation as a penalty. We first show that even a greatly restricted version of the problem is strongly 𝒩𝒫‐hard. We then develop an O(n2) algorithm to determine the makespan of a processing sequence of the jobs.
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

No journal information available

Organization

No organization information available
Cited Papers

Cited Papers

No cited papers available