Understanding Project Performance with Stochastic Interruption

delete2022-03-03
delete0
delete
OA
AI
K
Kazuaki Okubo *
M
Makoto Okumura
DOI:10.3390/su14052964delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
It is becoming increasingly important to implement projects with care on environmental conditions. Some projects can be carried out only during the allowable season and interrupted during other seasons. Such a project interruption is expected to affect the quality of the project's outcome through the decision-making of the stakeholders. This paper investigates the impact of interruption on the decision-making of the project owner and the contractor. We consider a project with some work after the interruption period (two-year project), the owner can select another option (one-year project) where all work is completed before the interruption period. If the fixed cost is higher relative to the benefit, our results show that the contractor prefers the one-year project, even when the owner selects the two-year project. We also represent the two threshold values of the interruption length that determine the owner's selection and relative quality of outcomes, respectively. It was found that a range of interruption length where the selected project does not provide the higher quality outcome.
Keywords:
project management
stochastic interruption
dynamic optimization

Journal

Sustainability cover
Sustainability
IF:
3.3
Papers:
10.7W
Citations:
28.4W

Organization

T
tohoku university
Scholars:
4.3W
Papers: 3.6W
Citations: 31
Cited Papers

Cited Papers

Amisulpride prevents nausea and vomiting associated with highly emetogenic chemotherapy: a randomised, double-blind, placebo-controlled, dose-ranging trial
err2018-11-28
err0
PREAI
errJ. Herrstedt; Y. Summers; K. Jordan; J. von Pawel; A. H. Jakobsen; M. Ewertz; S. Chan; J. D. Naik; M. Karthaus; S. Dubey; R. Davis; G. M. Fox
errShare
errSave
Construction Project Cost Escalation Factors
err2009-10-01
err174
PREAI
errShane, Jennifer S.; Molenaar, Keith R.; Anderson, Stuart; Schexnayder, Cliff
errShare
errSave
Recidivous cholesteatoma: DWI MR after canal wall up and canal wall down mastoidectomy
err2016-01-01
err0
errOAAI
errT. Bakaj; L. Bakaj Zbrozkova; R. Salzman; M. Tedla; I. Starek
errShare
errSave
Analysing factors affecting delays in Indian construction projects
err2012-05-01
err442
PREAI
errDoloi, Hemanta; Sawhney, Anil; Iyer, K. C.; Rentala, Sameer
errShare
errSave
Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
err2016-01-01
err241
PREAI
errLarsen, Jesper Kranker; Shen, Geoffrey Qiping; Lindhard, Soren Munch; Brunoe, Thomas Ditlev
errShare
errSave
researcher View more