Unit commitment considering generator outages through a mixed-integer particle swarm optimization algorithm
DOI:10.1016/j.asoc.2008.11.010.png)
Abstract
En 中文
The optimum economic operation and planning of electric power generation systems occupies a crucial position in the electric power industry. Unit commitment (UC) is an important function in generation resource management. Moreover, it is nowadays critical to incorporate reliability analysis of the power system into its design of operation strategy. For this purpose, equipment malfunction or failure should be considered in unit commitment. In this paper, first the model for UC considering generator outages is formulated, where the reliability requirement is incorporated into the spinning reserve constraint in the optimization design. Then, a mixed binary-and real-coded particle swarm optimization (PSO) is developed to locate the optimum generation combination. A 10-generator test power system is used to verify the effectiveness of the proposed approach along the 24-h planning horizon. A comparative study is conducted to examine the impact of reliability constraint on the optimal solution obtained. Furthermore, comparison is made between the proposed method and other methods including both analytical and meta-heuristic algorithms. (C) 2008 Elsevier B.V. All rights reserved.
Keywords:
Unit commitment
Generator outage
Particle swarm optimization
Stochastic search and optimization
Mixed-integer optimization
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
6.6
Papers:
1.4W
Citations:
4.8W