Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
J
Jinjiang Yuan
Zhengzhou University
32
H-index
258
Paper Count
4.0K
Citation Count
0
Related Insights
Subscribe
Published Papers
42
Publication Date
Publication Date
Impact Factor
Citations
Bicriterion parallel-machine scheduling of equal-length jobs to minimize total tardiness and number of tardy jobs
JOURNAL OF COMBINATORIAL OPTIMIZATION
IF
1.1
2025-09-26
0
PRE
AI
Zhang, Jing; Chen, Rubing; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E.
Share
Save
Spectral extremal problem on all (a, b, k)-critical graphs
Computational and Applied Mathematics
IF
0
2025-09-11
0
PRE
AI
Qixuan Yuan; Ruifang Liu; Jinjiang Yuan
Share
Save
Single-machine preemptive scheduling with assignable due dates or assignable weights to minimize total weighted late work
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2025-04-01
0
PRE
AI
Chen, Rubing; Dong, Xinyu; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E.
Share
Save
LP-Rounding Based Algorithm for Capacitated Uniform Facility Location Problem with Soft Penalties
TSINGHUA SCIENCE AND TECHNOLOGY
IF
3.5
2025-02-01
0
OA
AI
Miao, Runjie; Wu, Chenchen; Yuan, Jinjiang
Share
Save
Rescheduling to trade off between global disruption of original jobs with flexibility and scheduling cost of new jobs
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2024-10-01
1
PRE
AI
Chen, Rubing; Cheng, T. C. E.; Ng, C. T.; Wang, Jun-Qiang; Wei, Hongjun; Yuan, Jinjiang
Share
Save
The spectral radius of H2-free graphs
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2024-05-01
1
PRE
AI
Yuan, Qixuan; Liu, Ruifang; Yuan, Jinjiang
Share
Save
Single-machine scheduling of multiple projects with controllable processing times
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2023-08-01
4
PRE
AI
Geng, Zhichao; Yuan, Jinjiang
Share
Save
Revisit the scheduling problem with assignable or generalized due dates to minimize total weighted late work
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2022-12-30
1
PRE
AI
Chen, Rubing; Gao, Yuan; Geng, Zhichao; Yuan, Jinjiang
Share
Save
Pareto-scheduling of two competing agents with their own equal processing times
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-09-01
9
PRE
AI
Chen, Rubing; Geng, Zhichao; Lu, Lingfa; Yuan, Jinjiang; Zhang, Yuan
Share
Save
Preemptive scheduling to minimize total weighted late work and weighted number of tardy jobs
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-05-01
8
PRE
AI
Chen, Rubing; He, Ruyan; Yuan, Jinjiang
Share
Save
Bicriteria scheduling to minimize total late work and maximum tardiness with preemption
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2021-09-01
8
PRE
AI
Chen, Rubing; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E.
Share
Save
Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2021-08-01
5
OA
AI
Chen, Rubing; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E.
Share
Save
Scheduling with release dates and preemption to minimize multiple max-form objective functions
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2020-02-01
23
OA
AI
Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E.
Share
Save
ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2020-01-01
3
PRE
AI
Chen, Rubing; Yuan, Jinjiang; Geng, Zhichao
Share
Save
A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2019-02-01
27
OA
AI
Gao, Yuan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E.
Share
Save
Scheduling with or without precedence relations on a serial-batch machine to minimize makespan and maximum cost
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2018-09-01
22
PRE
AI
Geng, Zhichao; Yuan, Jinjiang; Yuan, Junling
Share
Save
Pareto optimization for the two-agent scheduling problems with linear non-increasing deterioration based on Internet of Things
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE
IF
6.1
2017-11-01
7
PRE
AI
Wan, Long; Wei, Lijun; Xiong, Naixue; Yuan, Jinjiang; Xiong, Jiacai
Share
Save
A further study on two-agent scheduling on an unbounded serial-batch machine with batch delivery cost
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-09-01
8
PRE
AI
Qi, Xianglai; Yuan, Jinjiang
Share
Save
Online scheduling with linear deteriorating jobs to minimize the total weighted completion time
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2016-01-01
23
OA
AI
Ma, Ran; Tao, Jiping; Yuan, Jinjiang
Share
Save
Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2016-01-01
19
PRE
AI
Wan, Long; Yuan, Jinjiang; Wei, Lijun
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
T
T.C.E. Cheng
H-index: 96 · Papers: 1.5K
N
Naixue Xiong
H-index: 90 · Papers: 1.1K
C
C.T. Ng
H-index: 39 · Papers: 244
李世胜
(Shisheng Li)
H-index: 39 · Papers: 152
J
Jing Zhang
H-index: 37 · Papers: 394
View more