Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
J
José M. Framiñán
universidad de sevilla
50
H-index
269
Paper Count
7.5K
Citation Count
0
Related Insights
Subscribe
Published Papers
105
Publication Date
Publication Date
Impact Factor
Citations
Operationalising Circular Futures: Scenario-Based Modelling of WEEE Supply Chains
Logistics-Basel
IF
3.6
2026-08-22
0
OA
AI
Rebecca Fussone; Rachele Fussone; Enrico Favazza; Azar Mahmoum Gonbadi; Paz Perez Gonzalez; Jose Manuel Framinan; Salvatore Cannella
Share
Save
A matheuristic to minimize makespan in parallel additive manufacturing machines
Journal of Industrial and Production Engineering
IF
4.6
2026-04-13
0
PRE
AI
Bruno Prata; Jose M. Framinan
Share
Save
Combining Simulation and Gradient Boosted Trees for the Stochastic Permutation Flowshop Scheduling Problem
IET COLLABORATIVE INTELLIGENT MANUFACTURING
IF
3.1
2025-12-18
0
OA
AI
Framinan, Jose M.
Share
Save
An Energy Management System for Industrial Manufacturing with demand response based on a Hybrid Robust MPC
IFAC PAPERSONLINE
IF
0
2025-10-01
0
PRE
AI
Gomez, Javier; Framinan, Jose M.; Escano, Juan M.; Bordons, Carlos
Share
Save
An energy management system for industrial manufacturing: A hybrid approach with demand response
Renewable Energy
IF
9.1
2025-07-15
0
OA
AI
Javier Gómez; José M. Framiñán; Juan M. Escaño; Carlos Bordons
Share
Save
Understanding after-market service channel selection for complex product-services supply chains: A game-theoretical approach
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-11-01
0
PRE
AI
Du, Pengqi; Framinan, Jose M.; Chen, Hongzhuan
Share
Save
Self-Adaptive Population-Based Iterated Greedy Algorithm for Distributed Permutation Flowshop Scheduling Problem with Part of Jobs Subject to a Common Deadline Constraint
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2024-08-01
3
PRE
AI
Li, Qiu-Ying; Pan, Quan-Ke; Sang, Hong-Yan; Jing, Xue-Lei; Framinan, Jose M.; Li, Wei -Min
Share
Save
Matching inventory and demand in a Fast Moving Consumer Goods company: A Decision Support System
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-08-01
0
OA
AI
Framinan, Jose M.; Guerrero, Francisco; Perez-Gonzalez, Paz; Toscano, Sonia
Share
Save
Digital twin model with machine learning and optimization for resilient production-distribution systems under disruptions
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-05-01
3
OA
AI
Corsini, Roberto Rosario; Costa, Antonio; Fichera, Sergio; Framinan, Jose M.
Share
Save
An analysis of the supply chain dynamics of remanufacturing with multiple collectors
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2024-01-01
4
PRE
AI
Framinan, Jose M.
Share
Save
A review and classification on distributed permutation flowshop scheduling problems
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-01-01
40
OA
AI
Perez-Gonzalez, Paz; Framinan, Jose M.
Share
Save
Exploring symbiotic supply chains dynamics
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-01-01
2
OA
AI
Fussone, Rebecca; Cannella, Salvatore; Dominguez, Roberto; Framinan, Jose M.
Share
Save
A constraint programming-based iterated greedy algorithm for the open shop with sequence-dependent processing times and makespan minimization
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2023-12-01
4
PRE
AI
Abreu, Levi R.; Prata, Bruno A.; Nagano, Marcelo S.; Framinan, Jose M.
Share
Save
An adaptive product changeover policy for a capacitated two-product supply chain in a non-stationary demand environment
INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT
IF
2.6
2023-05-30
3
PRE
AI
Corsini, R. R.; Costa, A.; Framinan, J. M.
Share
Save
An overview on the use of operations research in additive manufacturing
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2022-10-29
16
OA
AI
Framinan, Jose M.; Perez-Gonzalez, Paz; Fernandez-Viagas, Victor
Share
Save
Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-09-01
8
OA
AI
Prata, Bruno de Athayde; Fernandez-Viagas, Victor; Framinan, Jose M.; Rodrigues, Carlos Diego
Share
Save
A critical-path based iterated local search for the green permutation flowshop problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-07-01
7
OA
AI
Fernandez-Viagas, Victor; Prata, Bruno de Athayde; Framinan, Jose M.
Share
Save
Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-06-01
13
OA
AI
Fernandez-Viagas, Victor; Talens, Carla; Framinan, Jose M.
Share
Save
New efficient heuristics for scheduling open shops with makespan minimization
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-06-01
14
OA
AI
Abreu, Levi R.; Prata, Bruno A.; Framinan, Jose M.; Nagano, Marcelo S.
Share
Save
Analysing the impact of production control policies on the dynamics of a two-product supply chain with capacity constraints
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2022-03-24
18
PRE
AI
Corsini, Roberto Rosario; Costa, Antonio; Cannella, Salvatore; Framinan, Jose M.
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
潘
潘全科
(Quan-Ke Pan)
H-index: 87 · Papers: 363
A
Ana Paula Barbosa‐Póvoa
H-index: 61 · Papers: 413
Á
Ángel A. Juan
H-index: 60 · Papers: 550
R
Rubén Ruíz
H-index: 60 · Papers: 245
C
Chandrasekharan Rajendran
H-index: 57 · Papers: 248
View more