Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
R
Reinaldo Morábito
Universidade Federal de São Carlos
46
H-index
313
Paper Count
6.4K
Citation Count
0
Related Insights
Subscribe
Published Papers
97
Publication Date
Publication Date
Impact Factor
Citations
Optimization of structural assembly scheduling in the aeronautics industry
International Transactions in Operational Research
IF
2.9
2026-06-02
0
OA
AI
Bruno Jensen Virginio da Silva; Mateus Martin; Reinaldo Morabito; Vitoria Pureza
Share
Save
Hybrid heuristics for a 4-level integrated lot-sizing and cutting stock problem with multiple suppliers
Journal of the Operational Research Society
IF
2.7
2026-02-01
0
PRE
AI
Melega, Gislaine Mara; de Araujo, Silvio Alexandre; Jans, Raf; Morabito, Reinaldo
Share
Save
An MIP-heuristic approach for solving multiobjective helicopter flight scheduling in an oil and gas company
EURO JOURNAL ON TRANSPORTATION AND LOGISTICS
IF
2.7
2025-12-01
0
OA
AI
Filho, Angelo Aliano; Fantazzini, Mansur; Morabito, Reinaldo
Share
Save
The two-echelon location-routing problem: A comparative analysis of novel and existing compact formulations
Transportation Research Part E: Logistics and Transportation Review
IF
0
2025-10-28
0
OA
AI
Fernando Senna; Leandro C. Coelho; Reinaldo Morabito; Pedro Munari
Share
Save
The inventory routing problem with two-dimensional loading constraints
Computers & Industrial Engineering
IF
6.5
2025-10-15
0
PRE
AI
Pedro H.B. Hokama; Kamyla Ferreira; Pedro Munari; Reinaldo Morabito; Flavio Miyazawa
Share
Save
Models for the two-dimensional open-dimension rectangular packing problem
ENGINEERING OPTIMIZATION
IF
2.2
2025-09-01
0
PRE
AI
Martin, Mateus; Amorim, Fabio; Ferreira, Matheus; de Queiroz, Thiago Alves; Morabito, Reinaldo
Share
Save
A critical review of MIP models for lot-sizing and scheduling in the beverage industry
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2025-07-01
0
PRE
AI
Noble-Ramos, Victor Mario; Ferreira, Deisemara; Alem, Douglas; Morabito, Reinaldo
Share
Save
An optimisation approach for the agricultural and industrial tactical planning in the fresh fruit processing industry
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2025-04-16
0
OA
AI
Cleber Damião Rocco; Luís Guimarães; Bernardo Almada-Lobo; Reinaldo Morabito
Share
Save
A constraint programming model and a hybrid iterated local search algorithm for solving an aircraft recovery problem in the oil and gas industry
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
IF
2.7
2025-03-25
0
PRE
AI
Mateus Martin; Aldair Alvarez; Jonathan De La Vega; Reinaldo Morabito
Share
Save
An exact method for a last-mile delivery routing problem with multiple deliverymen
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-09-01
3
OA
AI
Senna, Fernando; Coelho, Leandro C.; Morabito, Reinaldo; Munari, Pedro
Share
Save
Hierarchical goal programming approaches to solve a discrete-time formulation for the aircraft recovery problem of a Brazilian oil and gas company
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2024-07-19
3
PRE
AI
Fantazzini, Tarley Mansur; Vieira, Thiago; Morabito, Reinaldo; Munari, Pedro
Share
Save
Solving the three-dimensional open-dimension rectangular packing problem: A constraint programming model
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2024-07-01
0
PRE
AI
Martin, Mateus; de Queiroz, Thiago Alves; Morabito, Reinaldo
Share
Save
Matheuristic for the lot-sizing and scheduling problem in integrated pulp and paper production
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-06-01
0
PRE
AI
Furlan, Marcos; Almada-Lobo, Bernardo; Santos, Maristela; Morabito, Reinaldo
Share
Save
Bi-objective model for tactical planning in corn supply chain considering CO2 balance
international journal of systems science
IF
3.3
2024-04-30
1
OA
AI
Aliano Filho, Angelo; Rocco, Cleber Damiao; Morabito, Reinaldo
Share
Save
An effective approach for bi-objective multi-period touristic itinerary planning
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2024-04-01
4
PRE
AI
Aliano Filho, Angelo; Morabito, Reinaldo
Share
Save
Comparative analysis of mathematical formulations for the two-dimensional guillotine cutting problem
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2023-08-03
3
OA
AI
Becker, Henrique; Martin, Mateus; Araujo, Olinto; Buriol, Luciana S. S.; Morabito, Reinaldo
Share
Save
An integer L-shaped algorithm for the vehicle routing problem with time windows and stochastic demands
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2023-07-01
6
PRE
AI
De La Vega, Jonathan; Gendreau, Michel; Morabito, Reinaldo; Munari, Pedro; Ordonez, Fernando
Share
Save
A location-transportation problem under demand uncertainty for a pharmaceutical network in Brazil
COMPUTERS & CHEMICAL ENGINEERING
IF
3.9
2023-06-01
2
PRE
AI
Jalal, Aura; Toso, Eli Angela Vitor; Morabito, Reinaldo
Share
Save
The vehicle allocation problem: Alternative formulation and branch-and-price method
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-08-01
0
PRE
AI
Cruz, Cesar Alvarez; Costa, Alysson M.; Munari, Pedro; Morabito, Reinaldo
Share
Save
Models for two- and three-stage two-dimensional cutting stock problems with a limited number of open stacks
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2022-05-12
5
PRE
AI
Martin, Mateus; Yanasse, Horacio Hideki; Santos, Maristela O.; Morabito, Reinaldo
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
M
Michel Gendreau
H-index: 93 · Papers: 627
J
Jean‐François Cordeau
H-index: 67 · Papers: 244
A
Ana Paula Barbosa‐Póvoa
H-index: 61 · Papers: 413
F
Fernando Ordóñez
H-index: 47 · Papers: 166
L
Leandro C. Coelho
H-index: 42 · Papers: 139
View more