Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
A
Atabak Elmi
Deakin University
13
H-index
31
Paper Count
612
Citation Count
0
Related Insights
Subscribe
Published Papers
12
Publication Date
Publication Date
Impact Factor
Citations
A Conceptual High Level Multiagent System for Wildfire Management
IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING
IF
8.6
2025-01-01
0
PRE
AI
Zadeh, Reza Bairam; Elmi, Atabak; Moghaddam, Valeh; Mahmoudzadeh, Somaiyeh
Share
Save
Distributed assembly permutation flow shop problem; Single seekers society algorithm
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2021-10-01
17
PRE
AI
Hamzadayi, Alper; Arvas, Mehmet Ali; Elmi, Atabak
Share
Save
Exploiting a fleet of UAVs for monitoring and data acquisition of a distributed sensor network
NEURAL COMPUTING & APPLICATIONS
IF
4.5
2021-03-30
13
PRE
AI
MahmoudZadeh, Somaiyeh; Yazdani, Amirmehdi; Elmi, Atabak; Abbasi, Amin; Ghanooni, Pooria
Share
Save
Cyclic job shop robotic cell scheduling problem: Ant colony optimization
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-09-01
29
PRE
AI
Elmi, Atabak; Topaloglu, Seyda
Share
Save
Combinatorial Benders cuts for assembly line balancing problems with setups
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2017-06-01
56
OA
AI
Akpinar, Sener; Elmi, Atabak; Bektas, Tolga
Share
Save
Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2016-09-01
34
PRE
AI
Elmi, Atabak; Topaloglu, Seyda
Share
Save
Multi-degree cyclic flow shop robotic cell scheduling problem with multiple robots
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2016-07-25
10
PRE
AI
Elmi, Atabak; Topaloglu, Seyda
Share
Save
Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2014-01-27
34
PRE
AI
Elmi, Atabak; Topaloglu, Seyda
Share
Save
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2013-10-01
58
PRE
AI
Elmi, Atabak; Topaloglu, Seyda
Share
Save
A tabu search approach for cell scheduling problem with makespan criterion
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2013-02-01
53
PRE
AI
Solimanpur, Maghsud; Elmi, Atabak
Share
Save
A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2011-08-01
84
PRE
AI
Elmi, Atabak; Solimanpur, Maghsud; Topaloglu, Seyda; Elmi, Afshin
Share
Save
A tabu search approach for group scheduling in buffer-constrained flow shop cells
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2011-03-01
31
PRE
AI
Solimanpur, Maghsud; Elmi, Atabak
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
T
Tolga Bektaş
H-index: 45 · Papers: 177
M
Maghsud Solimanpur
H-index: 27 · Papers: 69
A
Amirmehdi Yazdani
H-index: 26 · Papers: 127
Ş
Şeyda Topaloğlu
H-index: 21 · Papers: 52
S
Somaiyeh MahmoudZadeh
H-index: 17 · Papers: 48
View more