科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
F
Filippo Maria Ottaviani
Polytechnic University of Turin
7
H指数
34
论文数
156
被引数
0
相关解读
订阅
收录论文
8
发表时间
发表时间
IF
被引数
A Literature Review on the Integration of System Dynamics and Machine Learning/Artificial Intelligence in Addressing Environmental Matters
关于系统动力学与机器学习/人工智能在解决环境问题中集成应用的文献综述
ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS. CYBER-PHYSICAL-HUMAN PRODUCTION SYSTEMS: HUMAN-AI COLLABORATION AND BEYOND, APMS 2025, PT I
IF
0
2026-01-01
0
PRE
AI
Nesanir, Mustafa Ozan; Zenezini, Giovanni; Senvar, Ozlem; Ottaviani, Filippo Maria
分享
收藏
Information Systems: The Relief Valve for Project Management Tailoring in Public Procurement
信息系统:公共采购中项目管理定制的减压阀
PROCEEDINGS OF 19TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES, CISTI
IF
0
2026-01-01
0
PRE
AI
Rebuglio, Massimo; Ottaviani, Filippo Maria; Mendez, Lorena Ortiz; Carlin, Antonio; De Marco, Alberto
分享
收藏
Optimization in Asset Management: Defining the Objective Function and Constraints
资产管理中的优化:定义目标函数和约束条件
EMERGING TRENDS IN INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST
IF
0
2026-01-01
0
PRE
AI
Rebuglio, Massimo; Ottaviani, Filippo Maria; Saba, Francesca; Carlin, Antonio; De Marco, Alberto
分享
收藏
Artificial intelligence in achieving carbon-neutral buildings: a critical analysis of the emerging techniques, their applications and challenges
人工智能在实现碳中和建筑中的作用:新兴技术、应用及其挑战的批判性分析
Architectural Engineering and Design Management
IF
2.5
2025-12-22
0
OA
AI
Robert Osei-Kyei; Timur Narbaev; Justina Falana; Filippo Maria Ottaviani
分享
收藏
Automated machine learning pipeline for robust project cost and duration forecasting
自动化机器学习流程用于稳健的项目成本和工期预测
Automation in Construction
IF
11.5
2025-07-30
0
OA
AI
Filippo Maria Ottaviani; Pablo Ballesteros-Pérez; Timur Narbaev
分享
收藏
Work rate-based indicators for improving project performance regression models
基于工作速率的指标改进项目绩效回归模型
international entrepreneurship and management journal
IF
3.4
2025-05-26
0
OA
AI
Filippo Maria Ottaviani; Alberto De Marco; Timur Narbaev; Pablo Ballesteros-Pérez
分享
收藏
Improving Project Estimates at Completion through Progress-Based Performance Factors
BUILDINGS
IF
3.1
2024-02-29
4
OA
AI
Ottaviani, Filippo Maria; De Marco, Alberto; Narbaev, Timur; Rebuglio, Massimo
分享
收藏
Influence of cost contingency management on project estimates at completion
international entrepreneurship and management journal
IF
3.4
2023-08-04
5
PRE
AI
De Marco, Alberto; Narbaev, Timur; Ottaviani, Filippo Maria; Vanhoucke, Mario
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
M
Mario Vanhoucke
H 指数: 54 · 论文数: 463
R
Robert Osei‐Kyei
H 指数: 39 · 论文数: 134
P
Pablo Ballesteros‐Pérez
H 指数: 32 · 论文数: 120
A
Alberto De Marco
H 指数: 26 · 论文数: 206
T
Timur Narbaev
H 指数: 16 · 论文数: 67
查看更多