arrow
返回
P

Peixin Wang

east china normal university

8H指数
45论文数
276被引数
收录论文 4
发表时间
err分享
err收藏
Risk constrained economic dispatch with integration of wind power by multi-objective optimization approach
errENERGY
IF9.4
err2017-05-01
err32
PREAI
errLi, Y. Z.; Li, K. C.; Wang, P.; Liu, Y.; Lin, X. N.; Gooi, H. B.; Li, G. F.; Cai, D. L.; Luo, Y.
err分享
err收藏
Risk-aware short term hydro-wind-thermal scheduling using a probability interval optimization model
err2017-03-01
err64
PREAI
errChen, J. J.; Zhuang, Y. B.; Li, Y. Z.; Wang, P.; Zhao, Y. L.; Zhang, C. S.
err分享
err收藏
Wind-thermal power system dispatch using MLSAD model and GSOICLW algorithm基于MLSAD模型和GSOICLW算法的风热发电系统调度
err2017-01-01
err17
errOAAI
errLi, Y. Z.; Jiang, L.; Wu, Q. H.; Wang, P.; Gooi, H. B.; Li, K. C.; Liu, Y. Q.; Lu, P.; Cao, M.; Imura, J.
err分享
err收藏