arrow
返回
M

Maurício C. de Souza

Universidade Federal de Minas Gerais

19H指数
91论文数
993被引数
收录论文 18
发表时间
Approaches for the joint resolution of lot-sizing and scheduling with infeasibilities occurrences
err2021-05-01
err9
PREAI
errAlves, Fernanda F.; Nogueira, Thiago H.; de Souza, Mauricio C.; Ravetti, Martin G.
err分享
err收藏
Crane scheduling problem with non-interference constraints in a steel coil distribution centre
err2016-06-13
err17
PREAI
errMaschietto, Gabriela N.; Ouazene, Yassine; Ravetti, Martin G.; de Souza, Mauricio C.; Yalaoui, Farouk
err分享
err收藏
Time-indexed formulation and polynomial time heuristic for a multi-dock truck scheduling problem in a cross-docking centre
err2016-05-01
err32
PREAI
errCota, Priscila M.; Gimenez, Barbara M. R.; Araujo, Dhiego P. M.; Nogueira, Thiago H.; de Souza, Mauricio C.; Ravetti, Martin G.
err分享
err收藏
Surgical scheduling with simultaneous employment of specialised human resources
err2015-09-01
err39
errOAAI
errSilva, Thiago A. O.; de Souza, Mauricio C.; Saldanha, Rodney R.; Burke, Edmund K.
err分享
err收藏
Variable neighborhood descent with iterated local search for routing and wavelength assignment
err2012-09-01
err21
errOAAI
errMartins, Alexandre X.; Duhamel, Christophe; Mahey, Philippe; Saldanha, Rodney R.; de Souza, Mauricio C.
err分享
err收藏
Studies on the Dosage of Fiber-Reinforced Cemented Soils
err2011-12-01
err84
PREAI
errConsoli, Nilo Cesar; Zortea, Franco; de Souza, Mauricio; Festugato, Lucas
err分享
err收藏
Organic solid waste originating from the meat processing industry as an alternative energy source
errENERGY
IF9.4
err2011-06-01
err18
PREAI
errVirmond, Elaine; Schacker, Robson L.; Albrecht, Waldir; Althoff, Chtistine A.; de Souza, Mauricio; Moreira, Regina F. P. M.; Jose, Humberto J.
err分享
err收藏
Packing items to feed assembly lines
err2008-01-01
err28
PREAI
errde Souza, Mauricio C.; de Carvalho, Carlos R. V.; Brizon, Wellington B.
err分享
err收藏