科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
W
Wiesław Kubiak
Memorial University Newfoundland
28
H指数
137
论文数
3.0K
被引数
0
相关解读
订阅
收录论文
19
发表时间
发表时间
IF
被引数
A note on scheduling coupled tasks for minimum total completion time
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2022-04-23
2
PRE
AI
Kubiak, Wieslaw
分享
收藏
Shared processor scheduling of multiprocessor jobs
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2020-04-01
4
OA
AI
Dereniowski, Dariusz; Kubiak, Wieslaw
分享
收藏
Shared multi-processor scheduling
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2017-09-01
8
OA
AI
Dereniowski, Dariusz; Kubiak, Wieslaw
分享
收藏
A coordinating contract for transshipment in a two-company supply chain
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2010-11-01
31
PRE
AI
Hezarkhani, Behzad; Kubiak, Wieslaw
分享
收藏
Mathematical programming modeling of the Response Time Variability Problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2010-01-01
14
PRE
AI
Corominas, Albert; Kubiak, Wieslaw; Pastor, Rafael
分享
收藏
Apportionment methods and the Liu-Layland problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2009-03-01
3
PRE
AI
Jozefowska, Joanna; Jozefowski, Lukasz; Kubiak, Wieslaw
分享
收藏
Positive half-products and scheduling with controllable processing times
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2005-09-01
31
PRE
AI
Janiak, A; Kovalyov, MY; Kubiak, W; Werner, F
分享
收藏
A half-product based approximation scheme for agreeably weighted completion time variance
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2005-04-01
8
PRE
AI
Cheng, JL; Kubiak, W
分享
收藏
Fast fully polynomial approximation schemes for minimizing completion time variance
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2002-03-01
20
PRE
AI
Kubiak, W; Cheng, JL; Kovalyov, MY
分享
收藏
Two-machine flow shops with limited machine availability
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2002-02-01
99
PRE
AI
Kubiak, W; Blazewicz, J; Formanowicz, P; Breit, J; Schmidt, G
分享
收藏
Heuristic algorithms for the two-machine flowshop with limited machine availability
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2001-12-01
55
PRE
AI
Blazewicz, J; Breit, J; Formanowicz, P; Kubiak, W; Schmidt, G
分享
收藏
Scheduling parallel tasks with sequential heads and tails
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1999-01-01
10
PRE
AI
Drozdowski, M; Kubiak, W
分享
收藏
Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1997-01-01
33
PRE
AI
Kubiak, W; Steiner, G; Yeomans, JS
分享
收藏
Total completion time minimization in two-machine job shops with unit-time operations
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1996-10-01
8
PRE
AI
Kubiak, W; Timkovsky, V
分享
收藏
AN EFFICIENT ALGORITHM FOR A JOB-SHOP PROBLEM
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1995-12-01
5
PRE
AI
KUBIAK, W; SETHI, S; SRISKANDARAJAH, C
分享
收藏
COMPLEXITY OF A CLASS OF NONLINEAR COMBINATORIAL PROBLEMS RELATED TO THEIR LINEAR COUNTERPARTS
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1994-03-01
0
PRE
AI
SETHI, SP; KUBIAK, W
分享
收藏
MINIMIZING VARIATION OF PRODUCTION-RATES IN JUST-IN-TIME SYSTEMS - A SURVEY
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1993-05-01
133
PRE
AI
KUBIAK, W
分享
收藏
A PSEUDO-POLYNOMIAL ALGORITHM FOR A 2-MACHINE NO-WAIT JOB-SHOP SCHEDULING PROBLEM
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1989-12-01
20
PRE
AI
KUBIAK, W
分享
收藏
SCHEDULING TASKS ON 2 PROCESSORS WITH DEADLINES AND ADDITIONAL RESOURCES
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1986-09-01
11
PRE
AI
BLAZEWICZ, J; BARCELO, J; KUBIAK, W; ROCK, H
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
S
Suresh Sethi
H 指数: 65 · 论文数: 751
J
Jacek Błażewicz
H 指数: 49 · 论文数: 448
F
Frank Werner
H 指数: 47 · 论文数: 466
C
Chelliah Sriskandarajah
H 指数: 41 · 论文数: 221
G
Günter Schmidt
H 指数: 39 · 论文数: 438
查看更多