arrow
返回
H

Hasan Taheri

机构信息待补充

7H指数
18论文数
189被引数
收录论文 1
发表时间
Determining the timing of project control points using a facility location model and simulation
err2015-09-01
err14
errOAAI
errSabeghi, Narjes; Tareghian, Hamed R.; Demeulemeester, Erik; Taheri, Hasan
err分享
err收藏