科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
S
Serpil Erol
Gazi University
12
H指数
80
论文数
614
被引数
0
相关解读
订阅
收录论文
8
发表时间
发表时间
IF
被引数
A proactive approach to supply chain risk management: Shifting orders among suppliers to mitigate the supply side risks
JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT
IF
8.7
2017-01-01
98
PRE
AI
Kirilmaz, Oguzhan; Erol, Serpil
分享
收藏
Robot move sequence determining and multiple part-type scheduling in hybrid flexible flow shop robotic cells
混合柔性流水车间机器人单元中的机器人移动序列确定和多部分类型调度
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2016-10-01
20
PRE
AI
Batur, G. Didem; Erol, Serpil; Karasan, Oya Ekin
分享
收藏
A neuro-fuzzy model for a new hybrid integrated Process Planning and Scheduling system
用于新型混合集成过程计划和调度系统的神经模糊模型
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2013-10-01
33
PRE
AI
Seker, Alper; Erol, Serpil; Botsali, Reha
分享
收藏
Meta-heuristic approaches for part selection and tool allocation in flexible manufacturing systems
用于柔性制造系统中零件选择和工具分配的元启发式方法
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2006-06-01
6
PRE
AI
Arikan, M.; Erol, S.
分享
收藏
Fuzzy branch-and-bound algorithm for flow shop scheduling
流水车间调度的模糊分支定界算法
JOURNAL OF INTELLIGENT MANUFACTURING
IF
7.4
2004-08-01
29
PRE
AI
Temiz, I; Erol, S
分享
收藏
A decision network algorithm for multi-stage dynamic lot sizing problems
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
1999-09-01
3
PRE
AI
Gencer, C; Erol, S; Erol, Y
分享
收藏
Simulation modelling and analysis of a JIT production system
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
1998-07-01
33
PRE
AI
Baykoc, OF; Erol, S
分享
收藏
One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs
一台机器调度,以最大限度地减少迟到作业的最大提前
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
1998-07-01
13
PRE
AI
Guner, E; Erol, S; Tani, K
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
K
Kazuo Tani
H 指数: 18 · 论文数: 164
E
Ertan Güner
H 指数: 17 · 论文数: 62
C
Cevriye Gencer
H 指数: 14 · 论文数: 97
Ö
Ömer Faruk Baykoç
H 指数: 10 · 论文数: 43
İ
İzzettin Temiz
H 指数: 8 · 论文数: 26
查看更多