arrow
返回
V

Vijaya Kumar Manupati

Indian Institute of Management

21H指数
114论文数
1.6K被引数
收录论文 18
发表时间
err分享
err收藏
Sustainable management of EOL tyres: A remanufacturing supply chain network design
err2024-01-01
err4
PREAI
errManupati, Vijaya Kumar; Kulatunga, A. K.; Ray, Pritee; Rofin, T. M.
err分享
err收藏
Leveraging Blockchain to Support Collaborative Distributed Manufacturing Scheduling
err2023-02-10
err1
errOAAI
errRamakurthi, Veera Babu; Manupati, Vijaya Kumar; Varela, Leonilde; Putnik, Goran
err分享
err收藏
An innovative approach for resource sharing and scheduling in a sustainable distributed manufacturing system
err2022-04-01
err17
PREAI
errRamakurthi, Veerababu; Manupati, V. K.; Machado, Jose; Varela, Leonilde; Babu, Suresh
err分享
err收藏
Recovery strategies for a disrupted supply chain network: Leveraging blockchain technology in pre- and post-disruption scenarios
err2022-03-01
err49
PREAI
errManupati, V. K.; Schoenherr, Tobias; Ramkumar, M.; Panigrahi, Suraj; Sharma, Yash; Mishra, Prakriti
err分享
err收藏
Job Adjustment Strategy for Predictive Maintenance in Semi-Fully Flexible Systems Based on Machine Health Status
err2021-05-10
err2
errOAAI
errSamala, Thirupathi; Manupati, Vijaya Kumar; Nikhilesh, Bethalam Brahma Sai; Varela, Maria Leonilde Rocha; Putnik, Goran
err分享
err收藏
Semi-Double-loop machine learning based CPS approach for predictive maintenance in manufacturing system based on machine status indications
err2021-01-01
err19
errOAAI
errPutnik, Goran D.; Manupati, Vijaya Kumar; Pabba, Sai Krishna; Varela, Leonilde; Ferreira, Francisco
err分享
err收藏
Selection of the best healthcare waste disposal techniques during and post COVID-19 pandemic era
err2021-01-01
err85
errOAAI
errManupati, Vijaya Kumar; Ramkumar, M.; Baba, Vinit; Agarwal, Aayush
err分享
err收藏
A blockchain-based approach for a multi-echelon sustainable supply chain基于区块链的多级可持续供应链方法
err2019-11-01
err205
PREAI
errManupati, V. K.; Schoenherr, Tobias; Ramkumar, M.; Wagner, Stephan M.; Pabba, Sai Krishna; Singh, R. Inder Raj
err分享
err收藏
Investigation of reconfiguration effect on makespan with social network method for flexible job shop scheduling problem
err2017-08-01
err16
errOAAI
errReddy, M. B. S. Sreekara; Ratnam, C. H.; Agrawal, Rajeev; Varela, M. L. R.; Sharma, Ila; Manupati, V. K.
err分享
err收藏
err分享
err收藏