科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
S
Suresh Chand
Purdue University System
23
H指数
72
论文数
1.6K
被引数
0
相关解读
订阅
收录论文
14
发表时间
发表时间
IF
被引数
A periodic review inventory model with two delivery modes, fractional lead-times, and age-and-period-dependent backlogging costs
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2016-03-01
6
PRE
AI
Chand, Suresh; Li, Jian; Xu, Yanyi
分享
收藏
Learning and forgetting effects on a group scheduling problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2008-06-01
38
PRE
AI
Yang, Wen-Hua; Chand, Suresh
分享
收藏
Estimating the limits for statistical process control charts: A direct method improving upon the bootstrap
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2007-04-01
18
PRE
AI
Teyarachakul, Sunantha; Chand, Suresh; Tang, Jen
分享
收藏
The single-item lot-sizing problem with immediate lost sales
立即损失销售的单品批量问题
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2003-06-01
88
PRE
AI
Aksen, D; Altinkemer, K; Chand, S
分享
收藏
A Note on optimal allocation of work in stochastic assembly systems
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2002-03-01
1
PRE
AI
Rekhi, I; Chand, S; Moskowitz, H
分享
收藏
A model for parallel machine replacement with capacity expansion
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2000-03-01
54
PRE
AI
Chand, S; McClurg, T; Ward, J
分享
收藏
An iterative heuristic for the single machine dynamic total completion time scheduling problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
1996-07-01
15
PRE
AI
Chand, S; Traub, R; Uzsoy, R
分享
收藏
A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1996-06-01
14
PRE
AI
Blocher, JD; Chand, S
分享
收藏
A PARTS SELECTION MODEL WITH ONE-WAY SUBSTITUTION
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1994-02-01
34
PRE
AI
CHAND, S; WARD, JE; WENG, ZK
分享
收藏
SETUP COST STABILITY REGION FOR THE DYNAMIC LOT SIZING PROBLEM WITH BACKLOGGING
为积压的动态批量问题设置成本稳定区域
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1992-04-01
7
PRE
AI
CHAND, S; VOROS, J
分享
收藏
LOT SIZES AND SETUP FREQUENCY WITH LEARNING IN SETUPS AND PROCESS QUALITY
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1989-09-01
66
PRE
AI
CHAND, S
分享
收藏
SINGLE-MACHINE SCHEDULING TO MINIMIZE WEIGHTED EARLINESS SUBJECT TO NO TARDY JOBS
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1988-03-01
74
PRE
AI
CHAND, S; SCHNEEBERGER, H
分享
收藏
A COMPARISON OF AVERAGE AND DISCOUNTED COST MODELS FOR THE DYNAMIC LOT SIZE INVENTORY PROBLEM
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1985-10-01
2
PRE
AI
CHAND, S; TANG, K
分享
收藏
LOT SIZING FOR PRODUCTS WITH FINITE DEMAND HORIZON AND PERIODIC REVIEW INVENTORY POLICY
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1982-10-01
22
PRE
AI
CHAND, S
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
R
Reha Uzsoy
H 指数: 58 · 论文数: 290
H
Herbert Moskowitz
H 指数: 43 · 论文数: 267
K
Kwei Tang
H 指数: 29 · 论文数: 103
J
Jian Li
H 指数: 26 · 论文数: 174
R
Rodney D. Traub
H 指数: 24 · 论文数: 47
查看更多