Temperature correction protocol for in-situ monitoring of concrete during the curing and post-curing periods: application to low carbon concrete混凝土在养护和后养护期间现场监测的温度校正协议:低碳混凝土的应用cement concrete compositesIF02025-07-080OAAI
Recent developments in high-speed railway in Indonesia: Superstructure construction and track infrastructureTRANSPORTATION RESEARCH INTERDISCIPLINARY PERSPECTIVESIF3.82025-05-010PRE
Predicting the punching failure of lightly reinforced concrete flat slabs without shear reinforcementSTRUCTURESIF4.32025-04-010OAAI
Influence of reinforcement reductions on the response of reinforced concrete half-jointsENGINEERING STRUCTURESIF6.42024-12-011OAAI
Developments in Portland cement/GGBS binders for 3D printing applications: Material calibration and structural testingCONSTRUCTION AND BUILDING MATERIALSIF82023-12-015OAAI
Forensic assessments of the influence of reinforcement detailing in reinforced concrete half-joints: A nonlinear finite element studySTRUCTURESIF4.32022-04-0119OAAI
Seismic performance of exterior beam-column joints constructed with engineered cementitious composite: Comparison with ordinary and steel fibre reinforced concreteENGINEERING STRUCTURESIF6.42022-01-0132PRE