科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
A
Aïda Jebali
New York University
15
H指数
48
论文数
1.1K
被引数
0
相关解读
订阅
收录论文
14
发表时间
发表时间
IF
被引数
Forecasting and planning for a critical infrastructure sector during a pandemic: Empirical evidence from a food supply chain
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-09-01
0
PRE
AI
Aljuneidi, Tariq; Punia, Sushil; Jebali, Aida; Nikolopoulos, Konstantinos
分享
收藏
A dynamic approach to supply chain reconfiguration and ripple effect analysis in an epidemic
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2023-09-01
25
OA
AI
Brusset, Xavier; Ivanov, Dmitry; Jebali, Aida; La Torre, Davide; Repetto, Marco
分享
收藏
Production optimization in the time of pandemic: an SIS-based optimal control model with protection effort and cost minimization
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2023-01-31
3
OA
AI
Brusset, Xavier; Jebali, Aida; La Torre, Davide; Liuzzi, Danilo
分享
收藏
Production optimisation in a pandemic context
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2022-03-19
9
PRE
AI
Brusset, Xavier; Jebali, Aida; La Torre, Davide
分享
收藏
The integrated quay crane assignment and scheduling problems with carbon emissions considerations
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-03-01
21
PRE
AI
Kenan, Nabil; Jebali, Aida; Diabat, Ali
分享
收藏
Multi-product and multi-period closed loop supply chain network design under take-back legislation
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2021-01-01
41
PRE
AI
Diabat, Ali; Jebali, Aida
分享
收藏
Multi-period stochastic programming models for two-tiered emergency medical service system
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2020-11-01
13
PRE
AI
Boujemaa, Rania; Jebali, Aida; Hammami, Sondes; Ruiz, Angel
分享
收藏
An integrated flight scheduling and fleet assignment problem under uncertainty
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2018-12-01
38
PRE
AI
Kenan, Nabil; Jebali, Aida; Diabat, Ali
分享
收藏
Codeshare agreements in the integrated aircraft routing problem
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
IF
6.3
2018-11-01
9
PRE
AI
Kenan, Nabil; Diabat, Ali; Jebali, Aida
分享
收藏
A Chance-constrained operating room planning with elective and emergency cases under downstream capacity constraints
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-12-01
53
PRE
AI
Jebali, Aida; Diabat, Ali
分享
收藏
A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty
SIMULATION MODELLING PRACTICE AND THEORY
IF
4.6
2016-08-01
58
PRE
AI
Al-Dhaheri, Noura; Jebali, Aida; Diabat, Ali
分享
收藏
The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints
具有非零起重机重新定位时间和船舶稳定性约束的码头起重机调度问题
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2016-04-01
48
PRE
AI
Al-Dhaheri, Noura; Jebali, Aida; Diabat, Ali
分享
收藏
A stochastic model for operating room planning under capacity constraints
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2015-04-22
55
PRE
AI
Jebali, Aida; Diabat, Ali
分享
收藏
Operating rooms scheduling
手术室调度
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2006-01-01
272
PRE
AI
Jebali, A; Alouane, ABH; Ladet, P
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
D
Dmitry Ivanov
H 指数: 92 · 论文数: 506
A
Ali Diabat
H 指数: 54 · 论文数: 162
Κ
Κωνσταντίνος Νικολόπουλος
H 指数: 33 · 论文数: 203
A
Ali Diabat
H 指数: 32 · 论文数: 84
Á
Ángel Ruiz
H 指数: 29 · 论文数: 192
查看更多