科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
H
Hamed Samarghandi
University of Manitoba
16
H指数
38
论文数
894
被引数
0
相关解读
订阅
收录论文
17
发表时间
发表时间
IF
被引数
Comparing resilience strategies for a multistage green supply chain to mitigate disruptions: A two-stage stochastic optimization model
比较多阶段绿色供应链的弹性策略以减轻中断: 两阶段随机优化模型
JOURNAL OF CLEANER PRODUCTION
IF
10
2024-09-01
0
OA
AI
Mirzaee, Hossein; Samarghandi, Hamed; Willoughby, Keith
分享
收藏
Increasing supply chain resiliency through equilibrium pricing and stipulating transportation quota regulation
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2024-09-01
0
OA
AI
Pazoki, Mostafa; Samarghandi, Hamed; Behroozi, Mehdi
分享
收藏
A robust optimization model for green supplier selection and order allocation in a closed-loop supply chain considering cap-and-trade mechanism
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2023-10-01
17
OA
AI
Mirzaee, Hossein; Samarghandi, Hamed; Willoughby, Keith
分享
收藏
A three-player game theory model for carbon cap-and-trade mechanism with stochastic parameters
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-07-01
25
PRE
AI
Mirzaee, Hossein; Samarghandi, Hamed; Willoughby, Keith
分享
收藏
Regulating patient care in walk-in clinics
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2021-03-01
4
PRE
AI
Pazoki, Mostafa; Samarghandi, Hamed
分享
收藏
Take-back regulation: Remanufacturing or Eco-design?
收回监管: 再制造还是生态设计?
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2020-09-01
61
PRE
AI
Pazoki, Mostafa; Samarghandi, Hamed
分享
收藏
Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2019-10-01
16
PRE
AI
Samarghandi, Hamed
分享
收藏
Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2019-10-01
20
PRE
AI
Samarghandi, Hamed
分享
收藏
Studying the impact of merged and divided storage policies on the profitability of a remanufacturing system with deteriorating revenues
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2017-11-01
6
OA
AI
Samarghandi, Hamed
分享
收藏
On the exact solution of the no-wait flow shop problem with due date constraints
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2017-05-01
36
PRE
AI
Samarghandi, Hamed; Behroozi, Mehdi
分享
收藏
A particle swarm optimisation for the no-wait flow shop problem with due date constraints
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2015-02-04
27
PRE
AI
Samarghandi, Hamed
分享
收藏
Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2014-10-30
16
PRE
AI
Samarghandi, Hamed
分享
收藏
Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2013-08-01
15
PRE
AI
Samarghandi, Hamed; ElMekkawy, Tarek Y.; Ibrahem, Al-Mehdi M.
分享
收藏
Solving the no-wait flow-shop problem with sequence-dependent set-up times
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2013-07-09
26
PRE
AI
Samarghandi, Hamed; ElMekkawy, Tarek Y.
分享
收藏
A meta-heuristic approach for solving the no-wait flow-shop problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2012-12-15
42
PRE
AI
Samarghandi, Hamed; ElMekkawy, Tarek Y.
分享
收藏
An efficient tabu algorithm for the single row facility layout problem
单行设施布局问题的有效禁忌算法
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2010-08-01
95
PRE
AI
Samarghandi, Hamed; Eshghi, Kourosh
分享
收藏
A particle swarm optimization for the single row facility layout problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2010-05-01
102
PRE
AI
Samarghandi, Hamed; Taabayan, Pouria; Jahantigh, Farzad Firouzi
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
T
Tarek Y. ElMekkawy
H 指数: 26 · 论文数: 82
K
Kourosh Eshghi
H 指数: 18 · 论文数: 98
K
Keith A. Willoughby
H 指数: 13 · 论文数: 41
F
Farzad Firouzi Jahantigh
H 指数: 10 · 论文数: 43
H
Hossein Mirzaee
H 指数: 9 · 论文数: 25
查看更多